
Chaldron Progress Part 12
26th August 2010
Here is a selection of views showing progress on L1219 (see the original number in the last photo). Alan has fitted the top rail and also the brakegear, which has been fitted per original rather than some of the later attempts both at Seaham and Beamish. This works very well.
Once the top rails are secure and the shape has been created (by clamping and bolting), the striking boards (to protect the body when loosening stuck coal), miscellaneous metal fittings and the end profiles of the sides will be finished off. The waggon will receive a final coat of paint then numbering and lettering.
Come along to the Great North Steam Fair to see it!
Recent Comments