Foulbridge Tram Track Renewal

Foulbridge Tram Track Renewal

10th February 2010

Work on the renewal of rails at Foulbridge continues, despite the ever present threat of snow and ice!

Below: Cutting the tarmac to enable it to be excavated clear. Tram 10 lurks in the background – the present limit of passenger operation (though access to the depot roads has been maintained).

Below: Two views of the tarmac removal – this is being reused elsewhere on site.