Depot Road 4 - getting longer!

Depot Road 4 – getting longer!

18th November 2011
Road 4 is getting longer, as the two photos below show. The rails are working their way around the traction pole (and fortunately are able to exceed the clearances required as a minimum and still offer a smooth curve through to the centreline of the shed road) and the team is clearing the path as they progress. We have also placed an order for the floor to be slotted which will enable removal of sufficient concrete to allow laying of a base then the rails through the shed.
Meanwhile, the fleet is now decorated ready for the Christmas season to start (tomorrow) with a warm up session tonight – Children in Need. The north east activity is being filmed from the Museum, and with free entry we are expecting to be very busy!