
The weeks seem to get shorter and shorter as the year rolls by! The workshops are busy and the work inside is bearing fruit. We…

A bit of a varied roundup today, to clear the decks and catch up with news from around the team… Trolleybuses Below: At the end…

A quick catch up featuring last week’s work, and a little bit of this week too, with developments on various familiar fronts progressing well. Buses…

In this brief update we continue to follow the progress on Gateshead 10’s heavy overhaul, as well as looking at some work underway to improve…

This week we are mainly looking at the heavy overhaul of Gateshead 10, and some of the progress made in the last couple of weeks….

We’ve been catching our breath this week after the extremely busy summer holidays, and are now taking stock of feedback, job lists and other works…

This first part of this week’s post focusses on the road transport – buses and trams, plus road signs! The focus of the engineering work…

I realised I hadn’t posted this part-made post, so I’ve included it here for completeness, along with a lot of updates from the last few…

There is quite a bit to report this week, as we’ve had both a number of challenges operationally, and also seen some milestones achieved in…

The last few weeks have been fairly challenging, as we are operating with a depleted team as recruitment is underway and COVID-19 has somewhat ravaged…

The team have had a busy week, not helped by a fairly widespread dose of COVID-19 resulting in several members having to isolate. Trams and…

Here is a short update this week, to keep news posts ticking along… Engineering Below: The two portable ‘pits have arrived from North Bay Railway…

This post is a bit of a sweeping up of lose ends exercise, with various bits of news to report. We also had updated figures…

This post sweeps up a few different themes, that reflect recent progress and look ahead to the forthcoming Beamish Steam Gala… As a result, there…

The restoration of the Darlington Corporation bus shelter took another important step forward with the arrival of the restored structure at Beamish last Friday. The…

After a bit of a gap, the news returns… We’ve been very busy across the museum, in all departments. It is also the time of…

This week we have a miscellaneous round-up of transport and engineering news. As readers will no doubt know, the big news has been the opening…

This week’s post includes some nice milestones – including the start of testing on the Foulbridge – Town section of the Tramway. There is quite…

In this report we take a look specifically at the ongoing restoration of ex Dundee Gas Works Kerr Stuart 0-4-0WT No.721. This project is largely…

Today we called in at North Bay Engineering to view progress on the restoration of the Darlington cast-iron bus shelter. Since we last saw it,…

As has become the annual tradition, I thought a review of the year was timely, and like 2020’s article, it has the inevitable cloud of…

NEXUS visit Beamish By Matthew Ellis, Keeper of Transport Through contacts set up with Les Brunton from the Beamish Tramway Group, on Monday 13th December…

The blog resumes following a short hibernation (as I was on paternity leave!) with an update covering the period I was off. Matt kept notes…

Below: No.18 has been relocated to Rowley Station in order to carry out the shunting associated with Christmas (grottos once again being assembled in the…

This week there is quite a lot to report, so I will probably spill some of the image-based content into separate posts next week. Meanwhile,…
Recent Comments